Active Updates – 1/13/25

  • Please update your Do Not Enter units to Enter if you need to and have not already. 

Active Updates – 1/10/25

  • Lakeside Pool: Currently out of order. The leak detection company scheduled the repair on 01/27/25. It’s still on schedule.
  • Oaks Spa: The leak detection company has scheduled the repair on 01/28/25. It’s still on schedule.
  • Manors Gate: The repairs are complete and fully operational.
  • Manors Pedestrian Gate: Out of service at this time. More updates to follow.
  • Mailbox Handrails: The Handrails are expected to be installed and completed on 1/13/25.
  • Shuffle Board Courts: The resurfacing date is 01/26/25. It’s still on schedule.
  • Fencing Completion: The fence completion for Lakeside is currently in permitting. Once the installation date is provided an update will be released. Still awaiting start date from vendor.
  • Tile repair in the Grande: A repair will take place at night in the main hallway of the Grande in front of the restrooms from 01/08/25-01/10/25. In progress.
  • Fire extinguisher inspections: Completing Lakeside 1/10/25. With partial completion of The Oaks 1/10/25 with final completion dates forth coming.  

Active Updates – 1/8/25

  • Update: Thursday, January 9th, Firetronics will start on the 1st floor of the Grand, Lakeside East, and the Garden Homes.
  • Friday, January 10th, they will be at the Oaks Independent Living. If they do not finish on Friday, a day and time will be arranged later, and we will send emails to keep you informed.
  • Please let us know if you have any questions so we can provide the information.

Active Updates – 1/7/25

  • Tomorrow, from 8 a.m. to noon, Wednesday the 8th, the water will be turned off at 555 Waterford, 551 Waterford, 550 Salem, and 552 Salem. Phone calls were made to these addresses; this email and a note will also be left at the door as a reminder. If you have any questions, please call ext. 269 for Mary Ransom. Thank you!

Active Updates – 1/3/25

  • Lakeside Pool: Currently out of order. The leak detection company scheduled the repair on 01/27/25.
  • Oaks Spa: The leak detection company has scheduled the repair on 01/28/25.
  • Manors Gate: The repair is underway, and the expected completion date is Wednesday, 01/08/25.
  • Mailbox Handrails: The expected installation date for the Handrails is 01/21/25. 
  • Shuffle Board Courts: The resurfacing date is 01/26/25
  • Fencing Completion: The fence completion for Lakeside is in permitting. Currently, once the installation date is provided, an update will be released 
  • Tile repair in the Grande: A repair will take place at night in the main hallway of the Grande in front of the restrooms from 01/08/25-01/10/25. 

Active Updates – 12/31/24

  • Update on Lakeside Pool and Oaks Spa

    The Lakeside Pool and Oaks Spa will remain closed until necessary repairs are completed. Both were found to have leaks in the return piping, which caused the water levels to drop continuously.

    • Lakeside Pool: On January 27th, Advance Leak Detection will be on-site to repair the leak between 8:00 a.m. and 10:00 a.m.. The repair will involve cutting the concrete, fixing the leak, pouring new concrete, and texturing it once it is done. After the concrete is poured, we will need to wait 30 days for it to cure before any painting can be done if we choose to paint and to ensure no other issues remain.
    • Oaks Spa: On January 28th, Advance Leak Detection will be at the Oaks to repair the leak in the spa. Like the pool, the repair will require cutting the concrete, making the necessary repairs, and pouring new concrete and texture afterward. A 30-day curing period is required before painting if we choose to paint, and further assessments can be made.

    We will update you as the repairs progress and notify you when the facilities are ready to reopen. Thank you for your patience.

 

Reminder: Please refrain from parking any vehicles on the sidewalk.

DwellingLive Visitation Software

Emergency Information

Helpful Information

Lake County Office of Emergency Management Brochures

Pedestrian Gate Access

  • Pedestrian Gates – near Springwater and behind Edgewater – use an app called PDK or ProDataKey on your phone. Contact Mary Ransom with your name and email address to get set up. Mary Ransom@WatermanVillage.com or 352-383-00951 x269